+359 878 657 058

Termoservice logo

Filter

  • Energy Modeling

    Commissioning

    Building Type

    Interior Design and Construction

    Office Building

    K-12 Schools-all types

    Industrial Manufacturing

    Campus-Group of Buildings

    Retail Buildings

    Hotels, Residential, Dormitories

    Data Center

    Existing Buildings

    Public Assembly-Entertaiment

    Warehouse-General

    In Bulgaria

    In Russia

    Other Countries

  • Certification Status – LEED

    Certified

    Silver

    Gold

    Platinum

    Certification Status – BREEAM

    Pass

    Good

    Very Good

    Excellent

    Outstanding

    LEED Related

    BREEAM Related

    ENERGY AUDIT Related

    Rating Systems

    LEED_v2009

    LEEDv4

    Credit Categories (LEED Certification)

    EA - Energy and Atmosphere

    Sustainable Site

    Indoor Environmental Quality

    Innovation

  • HVAC Design

    HVAC Management

    HVAC Automation

    MEP Design

    HVAC Installation

Anglo-American School - Phase IV

Anglo-American School - Phase IV


BULGARIA Sofia

K-12, High School 1 950 m2

LEED-SCHOOLS v2009 Project # 1000070940

ENERGY MODEL Commissioning

GOLD Certified

  • Executive Summary

    The Anglo-American School Phase IV (AAS IV) involves the construction of two new extensions to the existing middle and high school buildings of the Anglo-American School in Sofia and a new Art Center building. The new construction has two levels. In order to stimulate the creative activity of the students - an Art Center is designed. The Art Center is a two-story building with а mezzanine level and a basement.

    The main core of the building is a multifunctional hall for training, performances and conferences.

    Heating & Ventilation System

    The heating of the Art Center Building is provided by a central boiler plant with two wood pellet boilers.

    The temperature of the heating agent provided for the end consumers is regulated by a three-way control valve installed before the circulation pump. The fresh air for the combustion process and ventilation of the boiler room enters through a fixed wall grille. The heating and ventilation is provided by two air handling units with heating and cooling section. The heating section is supplied with a 35% ethylene glycol solution from the heat exchanger in the boiler room.

    Air conditioning System

    Air conditioning is established via the two AHUs and their direct expansion cooling section. The cooling agent R410A is delivered by two VRV systems, installed on the roof of the building. The VRV units are with cooling capacities of 48.7kW and 55.4 kW.