+359 878 657 058

Termoservice logo

Filter

  • Energy Modeling

    Commissioning

    Building Type

    Interior Design and Construction

    Office Building

    K-12 Schools-all types

    Industrial Manufacturing

    Campus-Group of Buildings

    Retail Buildings

    Hotels, Residential, Dormitories

    Data Center

    Existing Buildings

    Public Assembly-Entertaiment

    Warehouse-General

    In Bulgaria

    In Russia

    Other Countries

  • Certification Status – LEED

    Certified

    Silver

    Gold

    Platinum

    Certification Status – BREEAM

    Pass

    Good

    Very Good

    Excellent

    Outstanding

    LEED Related

    BREEAM Related

    ENERGY AUDIT Related

    Rating Systems

    LEED_v2009

    LEEDv4

    Credit Categories (LEED Certification)

    EA - Energy and Atmosphere

    Sustainable Site

    Indoor Environmental Quality

    Innovation

  • HVAC Design

    HVAC Management

    HVAC Automation

    MEP Design

    HVAC Installation

National Office Mars Inc.

National Office Mars Inc.


RUSSIA Moscow

Offices - Interior Design and Construction 7 709 m2

LEED-CI v2009 Project # 1000062023

Energy Option 2 Commissioning

GOLD Certified

  • EXECUTIVE SUMMARY

    Mars LLC is locating its offices on the second, third, fourth and sixth floors of block 1 of the ALCON Business Center in Moscow. The new Mars National Office consists of office spaces, restrooms and WCs, kitchen, server room and utility spaces. The project is focused on the partial replacement and reconstruction of the existing heating installations and on the connection of the newly installed ventilation and air conditioning equipment to the central building’s ventilation and air conditioning systems.

    Heating and Cooling Systems

    The air conditioning of the MARS office is performed by the existing HVAC systems of the ALCON Business Center Building and by local fan coil units. The fresh air is prepared in four of the building’s air handling units. Each unit consists of supply section, water / air heating unit, water / air cooling unit and filter sections. The fan coil units are for duct installation, equipped with room thermostats valves.

    For the kitchen cooling is established via two split air conditioners. The sever room is provided with three split air conditioners combined into a single group for automatic control.

    Ventilation systems

    The mechanical ventilation of the premises is established via four central air handling units and exhaust ventilation systems. The air is supplied and exhaust through ceiling diffusers. For the kitchen a separate ventilation system is designed.